A38-A419 Whitminster Roundabout Canal Bridges

South West England

Project Description

The scheme shall ultimately deliver the construction of the canal through the A38 Whitminster Roundabout. The scheme shall include the construction of two new bridges, a canal channel within the roundabout and a towpath under the bridge, the work consists of the following: - • The procurement, design and construction of two precast segmental box culverts (16m length, 7.45m clear span and 4.69m internal height). To include headwall beam and N2 parapets. • Coordination of utility diversions including Severn Trent Water Main and W&W Gas Main. • Coordination of utility lifting and protection to include 13No BT Ducts, Vodafone, 2 No CityFibre, 2 No COLT and Virgin Media. This will include procurement, design and erection of a service bridge to carry existing BT ducts when lifted to the required height. • Construction of 6 No contiguous bore piled wing walls • Construction of 2 No modular concrete block wing walls • Construction of a canal channel between the two bridges within the centre of the roundabout, to include provision of a towpath and embankment retaining wall. • Carriageway surfacing, kerbing and footpath amendments where the carriageway level will require raising to pass over the bridges. • Partial replacement of the street light system on the roundabout • Installation of N2 Vehicle Restraint Systems on the bridge approaches • Installation of pedestrian guard railing • Drainage amendments and partial culverting of the southern drainage ditch. Installation of 2 No oil interceptors prior to discharge into the canal. • General vegetation and tree removal • Excavation and transportation of up to 14,000m3 of material to a site in Northleach where it will require placement over a designated field. • Replacement of road signs • Roadmarking reinstatement • Provision of 2 No ladders and horizontal recycled plastic fenders to be fixed to the towpath retaining wall • Media support during construction including time-lapse cameras, webcam and regular aerial images. Tend...

Project Details

Project Type
Infrastructure
Status
Completed
Estimated Value
1m-5m
Decision Date
7 November 2019
Start Date
1 November 2019
Completion Date
16 October 2020
Reference
GLOSCC001-DN421753-19787220
Region
South West England
Commissioning Body
Gloucestershire County Council

Other Projects by Alun Griffiths (Contractors)

View all projects by Alun Griffiths (Contractors)

Unlock

Data Source

This project was sourced from the UK Government Contracts Finder service, which publishes public sector contract awards.

View source

Worked on this project?

Share your experience working with Alun Griffiths (Contractors) on this or other projects.

Write a Review
    A38-A419 Whitminster Roundabout Canal Bridges | Alun Griffiths (Contractors) | Construction Rating