SE - AOMR Lot 1 - Mill Leese FSA Fence Replacement
Project Description
The Mill Leese Flood Storage Area (FSA) is located in Saltwood, Hythe, Kent (CT21 4QU). It forms part of the Hythe Protection Scheme. The overall objective of this project is to replace the existing fence and access gates to a more robust design with a minimum design life of 25 years. The recommended and preferred solution from the ESE is a steel post and panel fence constructed on the flat downstream and upstream toes of the embankment and a steel post and straining wire fence on the slopes. This hybrid solution will meet all project objectives.