Back to Colas
Under ConstructionConstruction

Overhead Catenary System for HS2 Ltd

UK-wide

Project Description

High Speed Two (HS2) Limited ('HS2 Ltd') is the body responsible for developing and promoting the new high speed railway system known as High Speed Two (HS2). HS2 will initially run between London and Birmingham (Phase 1). The Railway Systems tranche of work incorporates a number of critical disciplines for the HS2 Project, including without limitation the design, construction, commissioning and testing of track, overhead catenary, lineside M & E & tunnels, power, signalling and communications. This procurement relates to Overhead Catenary Systems (OCS), for which HS2 Ltd procured the design, manufacture, supply, installation, testing and commissioning. The Overhead Catenary Systems covers 469 single track kms, including 250 bridges, 58 viaducts, 47 underbridges, 148 overbridges and 115 culverts. Six passing / maintenance loops/sidings and four complex track junctions. 131 point ends, including 99 high-speed turnouts (between 130km/h and 230 km/h), 32 low-medium speed turnouts (up to and including 100km/h), 5 traps or diamonds.

Project Details

Project Type
Construction
Status
Under Construction
Estimated Value
100m+
Decision Date
7 January 2025
Start Date
3 February 2025
Completion Date
26 August 2032
Reference
tender_216013/1449165
Region
UK-wide
Commissioning Body
HS2

Data Source

This project was sourced from the UK Government Contracts Finder service, which publishes public sector contract awards.

View source

Worked on this project?

Share your experience working with Colas on this or other projects.

Write a Review