Michael Sea Outfall Design and Build (EV00261)

UK-wide

Project Description

The Coal Authority is looking for a specialist contractor to undertake the removal and replacement of temporary transfer pipe work and sea outfall, conveying water from the No.2 shaft at the former Michael colliery at East Wemyss in Fife to a discharge point 25m beyond the Mean Low Water Springs (MLWS) in the Firth of Forth, with a permanent installation. The works shall comprise of the site clearance of the existing infrastructure and the detailed design and construction of a pumping station, control building, working platform and outfall pipe line. This shall include the design and implementation of any additional ground investigations and other required surveys to inform the detailed design. The works shall also include laying of a duct for power cable installation by others. Successful tenderers will enter into a contract in accordance with the NEC4 Engineering and Construction Contract and additional conditions of contract. To express an interest in this opportunity and to access the complete suite of tender documents tenderers are invited to register on our tender portal at https://inbye.coal.gov.uk/s2c/ Once registered you will receive an email with your unique password and once logged in you can view the open opportunity.

Project Details

Project Type
Construction
Status
Completed
Estimated Value
500k-1m
Decision Date
14 January 2021
Start Date
1 December 2020
Completion Date
31 August 2021
Reference
CA18/4910
Region
UK-wide
Commissioning Body
The Coal Authority

Data Source

This project was sourced from the UK Government Contracts Finder service, which publishes public sector contract awards.

View source

Worked on this project?

Share your experience working with George Leslie on this or other projects.

Write a Review